Total closure of Haram Street from the shooting range for a period of 5 hours, starting at one on Friday morning

0
3


Giza Governorate announced that within the framework of handing over the sites of the fourth line stations to the project Subway On Al-Ahram Street for the National Authority for Tunnels to implement the project, the construction works of the fourth line subway station (Al-Ahram Station) will be completed, which requires the extraction of a machine to construct concrete walls (cutter) inside the station body on Al-Ahram Street at the site of the works.

The Giza Governorate clarified that the matter will require a complete closure of Al-Ahram Street in the direction coming from Al-Remaya Square and Al-Nasr Square towards Al-Ahram Street, Al-Mansuriya Street and Tersa axis for a period of one day, starting from one o’clock in the morning on Friday 31/12/2021 until six o’clock in the morning of the same day.

Major General Ahmed Rashid, the governor of Giza, the head of the Haram district, directed the field follow-up and alerted the executing company to preserve the asphalt layer and the works that take place on the street, with the speed of returning the thing to its origin in the event that the road layer is damaged in any sector.

He pointed out that in coordination with the General Directorate of Giza Traffic, the necessary traffic diversion was prepared to facilitate the movement of citizens and vehicles, as follows:

The movement of vehicles coming from Al-Remaya Square and Al-Nasr Square and wishing to walk towards Al-Ahram Street, Al-Mansuriya Road and Tersa axis, you should walk left towards Al-Ahram Old Gardens Street, then walk right on Al-Shams Street until Al-Mansouriya Road towards the streets of “Al-Haram – Faisal – Tersa”.

The General Directorate of Giza Traffic coordinated with the executing company to install the necessary directional and warning signs for the traffic diversion around the business to guide, educate and facilitate citizens.

The General Department of Giza Traffic will also designate the necessary traffic services in the entire diversion route to ensure the necessary traffic liquidity.





Source link
https://www.youm7.com/story/2021/12/30/%D8%BA%D9%84%D9%82-%D9%83%D9%84%D9%89-%D9%84%D8%B4%D8%A7%D8%B1%D8%B9-%D8%A7%D9%84%D9%87%D8%B1%D9%85-%D9%85%D9%86-%D9%85%D9%8A%D8%AF%D8%A7%D9%86-%D8%A7%D9%84%D8%B1%D9%85%D8%A7%D9%8A%D8%A9-%D9%84%D9%85%D8%AF%D8%A9-5-%D8%B3%D8%A7%D8%B9%D8%A7%D8%AA/5599819

LEAVE A REPLY

Please enter your comment!
Please enter your name here